G8PUO: The station server, controller and DStar repeater are being prepared for closedown in readiness for taking to site 28th Oct. Live website will be off during this time.

Admin

G8PUO: 24 Oct 2026 13:07:12 BST - Gateway resumed. Network service is running; end-to-end RF operation is not verified.

Admin

G8PUO: 24 Oct 2026 12:55:30 BST - Gateway placed in standby. Network traffic and time announcements paused; local RF repeating may remain active.

Older messages (4) Show / hide
Admin

G8PUO: 24 Oct 2026 12:48:19 BST - Gateway resumed. Network service is running; end-to-end RF operation is not verified.

Admin

G8PUO: 24 Oct 2026 12:42:46 BST - Gateway placed in standby. Network traffic and time announcements paused; local RF repeating may remain active.

Admin

G8PUO: The repeater is on the bench under test along with the controlling site PC. The test checking for robustness for remote site operation.

Admin

G8PUO: Repeater on bench test and will go to site in the first week of November.

GB3FW Top ↑

Admin

G8PUO: The station server, controller and DStar repeater are being prepared for closedown in readiness for taking to site 28th Oct. Live website will be off during this time.

Admin

G8PUO: Whilst working in the background on the hardware, the SCART Portsdown live website has a large amount of updates. Hope you like it.

Admin

G8PUO: DATV 23cm Receiver and Portsdown configuration almost complete and in testing. Hopefully will go to site in the next week (ish). BATC streaming will be included. Our live web page has been updated to include the embedded stream and currently used S51KQ as a test source.

Older messages (1) Show / hide
Admin

G8PUO: Receiver almost complete and will hopefully go to site within the next couple of weeks. BATC streaming will be included.

Remote Commands Top ↑

Latest 10 * commands per repeater from registered SMS users. Receipt does not confirm execution. Private parameters are omitted.

GB3FW

UK timeCallsignCommandResult
No authorised * commands received.

GB7FW

UK timeCallsignCommandResult
25 Oct 15:21:15 GMTG8PUO*GB7FW [parameters omitted]Rejected
25 Oct 15:18:11 GMTG8PUO*GB7FW REF001CApplied · link confirmed
25 Oct 15:16:09 GMTG8PUO*GB7FW REF079CApplied · link confirmed
25 Oct 14:52:16 GMTG8PUO*GB7FW REF079CIgnored
25 Oct 14:49:09 GMTG8PUO*GB7FW REF001CIgnored
25 Oct 08:59:15 GMTG8PUO*GB7FW REF001CIgnored
25 Oct 08:37:25 GMTG8PUO*GB7FW REF001CIgnored

Site Health Top ↑

Admin

G8PUO: Station Server & Controller reboot complete — Station ✓ · D-STAR ✓ (service running) · Weather ✓ (fresh station reading) · SMS ✓ (collector completed; delivery untested) · Email ✓ (SMTP authenticated; delivery untested) · LiFePO₄ battery ✓ (fresh voltage) · Lead-acid battery ✓ (fresh voltage) · GB3FW RX Pi awaiting setup · GB3FW TX Pi awaiting setup · Station Monitor Pi awaiting setup · NTP ✓ (Client running; clock synchronised) · Relay control ✓ (USB responding; startup OFF verified)

Admin

G8PUO: Station Server & Controller reboot complete — Station ✓ · D-STAR checking

Admin

G8PUO: Station Server & Controller reboot scheduled in 60 seconds (request 5)

Older messages (29) Show / hide
Admin

Station announcement — G8PUO: The station server, controller and DSTAR repeater are being configured on site.

Admin

G8PUO: Station Server & Controller reboot complete — Station ✓ · D-STAR NOT CONFIRMED (startup not confirmed) · Weather ✓ (fresh station reading) · SMS ✓ (collector completed; delivery untested) · Email ✓ (SMTP authenticated; delivery untested) · LiFePO₄ battery ✓ (fresh voltage) · Lead-acid battery ✓ (fresh voltage) · GB3FW RX Pi awaiting setup · GB3FW TX Pi awaiting setup · Station Monitor Pi awaiting setup · NTP ✓ (Client running; clock synchronised) · Relay control ✓ (USB responding; startup OFF verified)

Admin

G8PUO: Station Server & Controller reboot complete — Station ✓ · D-STAR checking

Admin

G8PUO: Station Server & Controller reboot scheduled in 60 seconds (request 4)

Admin

Station Server & Controller reboot complete — Station ✓ · D-STAR NOT CONFIRMED (startup not confirmed) · Weather ✓ (fresh station reading) · SMS ✓ (collector completed; delivery untested) · Email ✓ (SMTP authenticated; delivery untested) · LiFePO₄ battery ✓ (fresh voltage) · Lead-acid battery ✓ (fresh voltage) · GB3FW RX Pi awaiting setup · GB3FW TX Pi awaiting setup · Station Monitor Pi awaiting setup · NTP ✓ (Client running; clock synchronised) · Relay control NOT CONFIRMED (USB/startup OFF not confirmed)

Admin

Station Server & Controller rebooting — temporarily unavailable.

Admin

Station Server & Controller reboot complete — Station ✓ · D-STAR NOT CONFIRMED (startup not confirmed) · Weather ✓ (fresh station reading) · SMS ✓ (collector completed; delivery untested) · Email ✓ (SMTP authenticated; delivery untested) · LiFePO₄ battery ✓ (fresh voltage) · Lead-acid battery ✓ (fresh voltage) · GB3FW RX Pi awaiting setup · GB3FW TX Pi awaiting setup · Station Monitor Pi awaiting setup · NTP ✓ (Client running; clock synchronised) · Relay control NOT CONFIRMED (USB/startup OFF not confirmed)

Admin

Station Server & Controller rebooting — temporarily unavailable.

Admin

Station Server & Controller started following maintenance shutdown — Station ✓ · D-STAR NOT CONFIRMED (startup not confirmed) · Weather NOT CONFIRMED (fresh station reading not confirmed) · SMS ✓ (collector completed; delivery untested) · Email ✓ (SMTP authenticated; delivery untested) · LiFePO₄ battery ✓ (fresh voltage) · Lead-acid battery NOT CONFIRMED (fresh voltage not confirmed) · GB3FW RX Pi awaiting setup · GB3FW TX Pi awaiting setup · Station Monitor Pi awaiting setup · NTP ✓ (Client running; clock synchronised) · Relay control NOT CONFIRMED (USB/startup OFF not confirmed)

Admin

Station closing down for maintenance.

Admin

Station announcement — G8PUO: The station server, controller and DSTAR repeater are being prepared for closedown in readiness for taking to site 28th Oct. Please note, this live website will be off during this time.

Admin

Station announcement — All current status messages and station announcement cleared by G8PUO

Admin

Station announcement — G8PUO: the station server, controller and DStar repeater are being prepared for closedown in readiness for taking to site 28th Oct. Please note, this live website will be off during this time.

Admin

G8PUO: The station server, controller and DStar repeater are being prepared for closedown in readiness for taking to site 28th Oct. Live website will be off during this time.

Admin

G8PUO: System PC reboot complete — PC ✓ · D-STAR ✓ (service running) · Weather ✓ (fresh station reading) · SMS ✓ (collector completed; delivery untested) · Email ✓ (SMTP authenticated; delivery untested) · LiFePO₄ battery awaiting setup · Lead-acid battery awaiting setup · GB3FW RX Pi awaiting setup · GB3FW TX Pi awaiting setup · Station Monitor Pi awaiting setup

Admin

G8PUO: System PC reboot complete — PC ✓ · D-STAR checking

Admin

G8PUO: System PC reboot scheduled in 60 seconds (request 3)

Admin

System PC reboot complete — PC ✓ · D-STAR ✓ (service running)

Admin

Station PC rebooting — temporarily unavailable.

Admin

Station PC started following reboot.

Admin

Station PC rebooting — temporarily unavailable.

Admin

G8PUO: System PC reboot complete — PC ✓ · D-STAR ✓ (service running)

Admin

G8PUO: System PC reboot scheduled in 60 seconds (request 2)

Admin

G8PUO: System PC reboot complete

Admin

G8PUO: System PC reboot scheduled in 30 seconds

Admin

G8PUO: System Test Complete — Email ✓ · D-STAR ✓

Admin

G8PUO: Disaster recovery testing on system server PC

Admin

G8PUO: Site remote power is shaping up. Wind and solar working. Batteries being monitored.

Admin

G8PUO: Wind generator and solar are all working. Batteries are being monitored.

Weather Top ↑

Admin

G8PUO: The new weather station has been connected and configured at the G8PUO QTH on test.